I've had the urge to redo our downstairs bathroom for a very long time. Finally, I decided to do it. Brandon was awesome and gave me space to let me do my thing. But, he was right there willing to help when I needed him.
It left quite the mess underneath. I was determined to make it look normal again so I primed the drywall paper, put joint compound on it, and sanded. I did those steps on repeat for three days. I wanted to make sure the compound fully dried before I sanded it off. I never got it the way I wanted it, but I feel confident in saying that I did the best that I could.
Next came the paint job. We painted the ceiling white and the walls (most of them) grey. Peter really wanted to help, so I let him start the project. He was so thrilled and we didn't get too many dribbles.
My goal was to install ship lap on the wall behind the toilet. I'd never done it before, but I love the look. I was hoping it wouldn't cost too much since we only had a narrow wall to do. Brandon researched different methods of how to do it online, and we finally went to go to Home Depot to buy the wood. We got there and could not find the wood we needed. It was so frustrating. So we bought something we thought might work. When we cut it, it ended up splitting and making a big mess.
So, we ordered the right wood online from Home Depot. That way the employees had to find it and it was ready when I got there to pick it p. The next day we started cutting and painting. Here are the finished slats. If our wall would have been any bigger a table saw would have been essential. But, as it was, we just used a cordless saw and it worked well.
This is the wall freshly painted and almost ready for the nail gun party to begin. The tutorial we were following recommended painting the wall the color of your boards. Important because it would be nearly impossible to do any painting once the boards were installed.
A nail gun quickly became our best friend during this part of the project. We also used two quarters to determine the space between each board. Thank goodness we had decided take the toilet off. There was no way we could have done this project with it in the way. I LOVED the way this wall looked as soon as the first couple of boards went up. Since the wood we used was very thin we didn't have to use heavy duty nails. Just tiny ones that went in quickly.
After installing the boards, I had to cover nail holes and paint, paint, paint. Although, I had already done a few coats of paint on the boards before, I put another three coats on to cover the nail hole and make everything uniform and smooth. That took a few days to finish (because we still had life to live).
Then, the fun part came. I got to pick out:
The company I went with ended up sending these super fast. It was nice. We also got a mirror (from At Home), and the light fixture from Overstock (where it was nearly $40 cheaper then Home Depot). Getting all these installed was so much fun. Brandon did this part of the project.
The last thing I did was paint the vanity using white chalk paint that I had left over from another project. I wasn't sure how it would turn out, but I knew the ugly color it was wasn't going to work. I'm glad I did it even though I did have to buy new cupboard knobs to match.
Then, I took the boys over to the Rod Works, and we bought nick knacks. Peter picked a white ceramic pineapple, and Luke picked out a blue glass container. They were so proud to put them in the new bathroom. I picked out the rest of the items. Truthfully, it helps to hide the ugly paint problem we have. Sadly, the caulk that the previous owners used to install the vanity won't absorb paint. It's been a pretty great solution to a very annoying problem.
































